One supplier for Smart Film, Smart Glass, PNLC and Blackout Film. Cut-to-size film with wires ready for installation, delivered in 7 business days, with training, guides and accessories included.
No MOQ
All PDLC Products
Training included

SAMPLE KIT
A Demo That Switches On Site
✓ A5 demo glass (5.8 × 8.3″), AAA battery-operated
✓ Portable for site visits with clients, designers and architects
✓ A5 film samples of every product to practice on
✓ Branded presentation box for premium pitches

PARTNERSHIP BROCHURE
What the Program Includes
✓ Partner pricing that protects your margins
✓ Leads allocated within your territory
✓ White label: your brand on transformers, remotes and brochures
✓ Marketing assets, project portfolio and installation videos
NEW TO PDLC?
From First Sample to First Client
No smart film experience? No problem. Most installers need three to four practice installations before they sell the service. This is the path we walk with you.

STEP A
Start with plug-in samples. Practice sticking film on glass, then show designers, architects and clients how it switches.

STEP B
Install a few small office windows near power. Measure carefully, deduct 1/8″ (3 mm) per side and mark cut-outs in advance.

STEP C
Finish a real client project, take photos and promote the service with confidence in your installation quality and finish.
Tell us about your film business. We reply with a dedicated plan for your territory: partner pricing, a sample kit and your first steps.
Chat on WhatsApp
OFFICE MOMENTS
Every Office Has These Moments
Show them to your clients and the privacy sells itself.
The Dry-Stick Method in 4 Steps
Adhesive smart film goes on dry, without water. Clean prep, careful positioning and patient handling make the job.

01
Unpack and Test
Lay every piece on a clean long table. Connect it through the transformer and confirm it works before sticking.

02
Dry-Stick
No water. Clean glass and film thoroughly. Use 90% alcohol on fingerprints and handle edges patiently for a clean bond.

03
Connect to Power
Connect to a 48 VAC transformer with a switch, a remote or both. Solder the film wires securely.

04
Finish Edges and Profiles
Plan frames, rubber, tape or panels so film edges and wiring stay protected and the job looks professional.
Clear or Private, One Switch
Adhesive Smart Film Specifications
PET ITO base, optimal for adhesion. An extra IR-blocking layer lets it handle sun and heat.

Your Concerns, Our Confidence
What film installers worry about before their first smart film job
“My team works wet. PDLC goes on dry.”
Dry-stick guides, videos and support
Step-by-step guides, installation videos, tips and practice samples. Our technical team is with you on site questions, from the first job to the hundredth.
“I am not an electrician.”
Low voltage, wires ready to install
The film runs on 48 VAC through a transformer that plugs into standard 110 VAC. Cut-to-size pieces arrive with wires attached, and you get the full accessories list.
“Where will the work come from?”
Leads in your territory
We pass you leads in your area and give you marketing assets, a project portfolio and a demo glass to close jobs on site.
“Will the margin be worth it?”
Partner pricing, no stock risk
Partner pricing that protects your margins. No minimum order, so you buy per project.
“Long lead times will stall my jobs.”
Cut to size, 7 business days door to door
Any size you measure, any length, delivered to your door or the project site.
“What if something fails after install?”
Tested before it ships, 3-year warranty
You test every piece on the table before sticking. Service life is over 15 years, with a 3-year warranty.
“I want to sell under my own brand.”
Full white label
Your brand on transformers, remotes, brochures and technical documents.











