SMART FILM INSTALLER PROGRAM · WHOLESALE PDLC FILM

Install Window Film? Now Add Smart Film to Office Glass

One supplier for Smart Film, Smart Glass, PNLC and Blackout Film. Cut-to-size film with wires ready for installation, delivered in 7 business days, with training, guides and accessories included.

Smart film in office
Smart film in office
Clear
Private

No MOQ

All PDLC Products

Training included

All PDLC Products

Smart Film, Smart Glass, PNLC, Blackout Film

Online

Cut to size with wires, door to door in 7 business days

No MOQ

One film is fine

Training

Guides, videos and technical support

Accessories

Transformers, sliding doors, cables, wire tools

Network Chain

Architects & Designers network

OFFICE MOMENTS

Every Office Has These Moments

Show them to your clients and the privacy sells itself.

Burger lunch, smart glass clear, private on hover
Yelling on the phone, smart glass clear, private on hover
Top secret meeting, smart glass clear, private on hover
Feet on the desk, smart glass clear, private on hover

Your Concerns, Our Confidence

What film installers worry about before their first smart film job

Customer

SFI Team

“My team works wet. PDLC goes on dry.”

Dry-stick guides, videos and support

Step-by-step guides, installation videos, tips and practice samples. Our technical team is with you on site questions, from the first job to the hundredth.

“I am not an electrician.”

Low voltage, wires ready to install

The film runs on 48 VAC through a transformer that plugs into standard 110 VAC. Cut-to-size pieces arrive with wires attached, and you get the full accessories list.

“Where will the work come from?”

Leads in your territory

We pass you leads in your area and give you marketing assets, a project portfolio and a demo glass to close jobs on site.

“Will the margin be worth it?”

Partner pricing, no stock risk

Partner pricing that protects your margins. No minimum order, so you buy per project.

“Long lead times will stall my jobs.”

Cut to size, 7 business days door to door

Any size you measure, any length, delivered to your door or the project site.

“What if something fails after install?”

Tested before it ships, 3-year warranty

You test every piece on the table before sticking. Service life is over 15 years, with a 3-year warranty.

“I want to sell under my own brand.”

Full white label

Your brand on transformers, remotes, brochures and technical documents.

NEW TO PDLC?

From First Sample to First Client

No smart film experience? No problem. Most installers need three to four practice installations before they sell the service. This is the path we walk with you.

Smart film samples unrolled on a work table

STEP A

Start With Samples

Start with plug-in samples. Practice sticking film on glass, then show designers, architects and clients how it switches.

Installer applying adhesive smart film to an existing office glass wall

STEP B

Run Office Pilots

Install a few small office windows near power. Measure carefully, deduct 1/8″ (3 mm) per side and mark cut-outs in advance.

Business meeting in a glass-walled office with smart film on the partition

STEP C

Deliver a Client Project

Finish a real client project, take photos and promote the service with confidence in your installation quality and finish.

The Dry-Stick Method in 4 Steps

Adhesive smart film goes on dry, without water. Clean prep, careful positioning and patient handling make the job.

Testing a smart film piece with a remote before installing

01

Unpack and Test

Lay every piece on a clean long table. Connect it through the transformer and confirm it works before sticking.

Peeling the protective layer from adhesive smart film

02

Dry-Stick

No water. Clean glass and film thoroughly. Use 90% alcohol on fingerprints and handle edges patiently for a clean bond.

Installer connecting smart film wiring on office glass

03

Connect to Power

Connect to a 48 VAC transformer with a switch, a remote or both. Solder the film wires securely.

Trimming the smart film edge after installation

04

Finish Edges and Profiles

Plan frames, rubber, tape or panels so film edges and wiring stay protected and the job looks professional.

SFI smart film sample kit: A5 demo glass and branded presentation box

SAMPLE KIT

A Demo That Switches On Site

✓ A5 demo glass (5.8 × 8.3″), AAA battery-operated

✓ Portable for site visits with clients, designers and architects

✓ A5 film samples of every product to practice on

✓ Branded presentation box for premium pitches

Cover of the SFI smart film installer partnership brochure

PARTNERSHIP BROCHURE

What the Program Includes

✓ Partner pricing that protects your margins

✓ Leads allocated within your territory

✓ White label: your brand on transformers, remotes and brochures

✓ Marketing assets, project portfolio and installation videos

Adhesive Smart Film Specifications

PET ITO base, optimal for adhesion. An extra IR-blocking layer lets it handle sun and heat.

Office glass wall with adhesive smart film switched to its private frosted state

Types

T91 White, T40 Grey, T15 Black

Thickness

About 20 mil (500 µm)

Max width

70.8″ (1800 mm)

Length

Unlimited

Format

Cut to size with wires, or rolls

Operating voltage

48–65 VAC

Switching time

Under 0.2 seconds

Haze (ON)

Below 4%

UV blocking

99%

Glass side

Interior or exterior

Control

Switch, remote or smart-home dry contact

Service life

Over 15 years

Warranty

3 years